To: MOR HAFREN
Stop CF3 incinerator
stop the planning of an incinerator being built on our doorsteps
Why is this important?
A new incinerator is planned to be built in CF3 on Newlands Road, Wentloog Cardiff. This is in very close proximity to homes & schools. For example it is only 500 meters away from Eastern High School. Many residences and other schools within the CF3 are also well within a 1/2-mile radius of it.
The planned incinerator will burn 200,000 tonnes of industrial waste per year and will operate 24/7. It is planned to be built as early as 2020/21.
The industrial waste to be burned will be transported to the planned site using 80 lorries everyday each carrying 20 tonnes of waste. The toxic ash generated by the incinerator will also need to be transported away.
The size of the planned site is 1.5 rugby pitches in size with the main building being over 40 meters in height and the chimney stack being over 70 meters in height.
We believe this incinerator is not what residents of CF3 want in their community. We believe this will generate noise, air pollution, traffic and will not be good for the health of those living in the CF3 community.
We only have until the 29th of November to oppose this through consultation.
We appreciate you taking the time to do this and help keep CF3 a healthy community everyone wants to live and work in.
The planned incinerator will burn 200,000 tonnes of industrial waste per year and will operate 24/7. It is planned to be built as early as 2020/21.
The industrial waste to be burned will be transported to the planned site using 80 lorries everyday each carrying 20 tonnes of waste. The toxic ash generated by the incinerator will also need to be transported away.
The size of the planned site is 1.5 rugby pitches in size with the main building being over 40 meters in height and the chimney stack being over 70 meters in height.
We believe this incinerator is not what residents of CF3 want in their community. We believe this will generate noise, air pollution, traffic and will not be good for the health of those living in the CF3 community.
We only have until the 29th of November to oppose this through consultation.
We appreciate you taking the time to do this and help keep CF3 a healthy community everyone wants to live and work in.